INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

LV switchgear Factory Acceptance Test.

LV switchgear Factory Acceptance Test.

LV switchgear Factory Acceptance Test.

(OP)
I suppose to go for FAT LV swithgear. what should i check or inspect during the FAT test? Just FYI..i dont have any experience to go for FAT..i just working for 1 year++ at one of the power plant..

RE: LV switchgear Factory Acceptance Test.

You should tell your supervisor that you would love to go to the FAT but that you don't yet have the experience to inspect the panel. Ask that one of the more experienced guys represents the company at the FAT and that you attend in a learning capacity only.

If you have to go on your own, make sure the spec is a good one and that the drawings you have are clear and accurate and most importantly that they are the same revision as the panel builder is using. Query everything in the spec or on the drawings that you are unsure of with the designer before you set off. If the spec references some standard ask for a copy of the standard and get familiar with it. Once you get there check against the spec and drawings. If you can't physically check something ask for certification from the suppliers. You won't be able to test everything in the spec, certainly not on a big panel with high energy circuits, so understand what can and can't be tested at the panel shop and what the limitations of their facility is. Remember that their test engineer probably knows little about your intended use for the panel and may need some help getting a functional test developed. This comment applies more to control panels with, say, a PLC and / or a variable speed drive installed than it does to a switchboard.

Often you get an instinctive feel for a panel from the first moments. Is it tidy? Do all the fixings match? Is ferruling tidy and consistent? Is the paintwork chipped and scratched? The same applies to a panel shop. Is it busy? Is it tidy? What is the general attitude on the shop floor? Remember, the shop floor guys are the ones who actually build it; the smiling salesmen just win the business. If they don't care about their job, they won't care about your panel.

Enjoy the experience!
 

----------------------------------
  
Sometimes I wake up Grumpy.
Other times I just let her sleep!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources