INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Roof Live Load - Temporary Portable Building

Roof Live Load - Temporary Portable Building

Roof Live Load - Temporary Portable Building

(OP)
What is an acceptable minimum roof live load requirement for a temporary office building (3 to 5 years)?

Would 10 psf be acceptable???

The construction method is modular using timber framing on steel framed floor deck supported above grade on concrete foundation pedestals. These type of building are commercially available from several manufacturers and are generally used as a short term solution for office accomodation etc.

hammer

RE: Roof Live Load - Temporary Portable Building

As per ASCE-7 the minimum allowable roof load is 12psf for unaccessable roofs, can you design a building which is to stay on ground for 5 years with a load even less then that?

RE: Roof Live Load - Temporary Portable Building

Are you considering [i]snow[/] load as a [i]live[/] load? Even if it is a "temporary" structure, the roof should be designed for Snow Loads per ASCE-7.

RE: Roof Live Load - Temporary Portable Building

3-5 years is not really temporary.....temporary is usually something like 90 days or less..

Design it like a "real" strcuture...

RE: Roof Live Load - Temporary Portable Building

I agree with mike the engineer, 3 to 5 years is not temporary and it should be designed to the full live,snow and wind load.

That is 3 to 5 snow seasons any of which could have a 1 in 50 year dump. If this happened you wouldnt have a leg to stand on.

csd

RE: Roof Live Load - Temporary Portable Building

Many "temporary" buildings have a funny way of remaining in use far longer than anticipated.  I am currently working on repairs to some "temporary" warehouses that were built in the early 1940's for World War II.  But now they are considered historic and cannot be demolished.

RE: Roof Live Load - Temporary Portable Building

In ASCE 7-05, Table 4-1, "Roofs, Ordinary flat, pitched, and curved roofs" the uniform live load is 20 psf. I suppose that this could be reduced as noted in Section 4.9  of ASCE 7.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources