INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Is Shear Reinforcement Req'd. for Bottom of Columns?

Is Shear Reinforcement Req'd. for Bottom of Columns?

Is Shear Reinforcement Req'd. for Bottom of Columns?

(OP)
I have got a question about shear reinforcement(a.k.a. stirrups, ties or links) for the bottom of column bars that are embedded in deep slabs or footings, esp. for deep footings (>= 36").  

Do we need to provide stirrups in this part of the column?  Please see Sketches #1 abnd #2 below.  Should it be like Sketch #1, i.e. No stirrups or shear reinforcement provided in the part of the column embedded in the slab?

Sketch #1:


     I  I
     ----
     I  I
     ----
     I  I
     ----
     I  I
     ----
     I  I
----------------
     I  I
     I  I
     I  I
     I  I
     I  I
  ---    ---
-----------------

Or should it be like Sketch #2, i.e. Stirrups or Shear Reinforcement provided in the part of column embedded in the column?

Sketch #2:


     I  I
     ----
     I  I
     ----
     I  I
     ----
     I  I
     ----
     I  I
----------------
     I  I
     ----
     I  I
     ----
     I  I
  ---    ---
-----------------

Please submit your votes now.

I would have thought that it would be Sketch #2 but I would like to hear the opinions of people familiar with this situation, or foundation engineers who deal with this on a daily basis.

ACI 318-05 in Section 11.5.6.1 (Minimum Shear reinforcement) on Page 157 states that, "A minimum area of shear reinforcement , Av min, shall be provided in all reinforced concrete flexural members (prestressed and nonprestressed) where Vu exceeds 0.5 * phi * Vc, except:

(a) slabs and footings;

(b) Concrete joist construction defined by 8.11;

(c) Beams with h not greater than the largest of 10 in., 2.5 times thickness of flange, or 0.5 the width of web.

Is the shear reinforcement required in the part embedded in the slab, and if not, why not?  Is it because there is negligible shear there?  Is it because that part of the column is meant for embedment only?  Or is it because it is too difficult for the Contractor to get the ties in there.  Thanks in advance.

RE: Is Shear Reinforcement Req'd. for Bottom of Columns?

For a bridge the answer is Yes, Sketch 2.

RE: Is Shear Reinforcement Req'd. for Bottom of Columns?

For a building not in a seismic zone, with slab on all 4 sides the ties are only required above and below the slab.

I am not sure if there are seismic rules that dictate otherwise.

csd

RE: Is Shear Reinforcement Req'd. for Bottom of Columns?

See ACI 318,
Sections 7.10.5.4 and 7.10.5.5

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources