INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Compaction Wet clay

Compaction Wet clay

Compaction Wet clay

(OP)
Hi to all, this is my first post.

Building an embankment, 3m avg height for a future motorway, with Stoney clay, with borderline levels of moisture. Would laying a starter layer of 200m of pebble-like material help dry the clay faster, and so achieve better CBR values?

Thanks

RE: Compaction Wet clay

Doubtful - and are you wanting better "dry" or "soaked" CBR values?  The most appropriate ways are to (1) find a borrow pit where the moisture content is near optimum or (2) excavate the material, lay it in an open site to dry out to near optimum then transport it to the site and compact.

RE: Compaction Wet clay

My experience says that one shouold be cautious about that first layer, if the site is wet.  Compaction equipment seems to have the ability to pump that moisture up into dryer material.

Likewise, after rain, compacting of the upper less moist  material will bring moisture up also.

So using a starter layer of material less susceptible to moisture is a good idea.

RE: Compaction Wet clay

oldestguy - agree with your premise - but it won't help the clay he is placing dry faster as he wanted or help in his CBR values.

RE: Compaction Wet clay

Are you using the granular layer as a drainage blanket to increase the rate of consolidation prior to the construction of the road - i.e. reduce the drainage path, and if so are you also using surcharging to improve the ground?

RE: Compaction Wet clay

(OP)
Thanks for the anwers.

I cannot stockpile because if I do it I run the risk of getting the material wetter if it rains (very often here).

The idea is first not to get moisture from the ground up into the first layers of embankment when we compact. Also what iandig says. So if I have a 8 meter embankment I am thinking of using a sandwich layer halfway up.

The ones we have done without this layer are giving us rutting problems in localised points. I want to avoid using lime...

We started today, I will tell you if it works..

RE: Compaction Wet clay

Just as an aside, if you're building a layer that won't perc up the groundwater you should be using angular rock, as the rounded rock will tend to not support your upper layers as well.  You probably already know this, just the terminology 'pebble' tends to refer to a pea gravel material, not a crushed base.  Also if you're using clay like material, best to compact in thin lifts, probably 150-300mm, the thinner the better.  Though in all honesty some free-draining imported gravel would be the better option if you're building for the long term.  Clay tends to do funky things when exposed to wet weather.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources