INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Screwed Connection

Screwed Connection

Screwed Connection

(OP)
Hi everybody
I need your response.
In my design spec. there is paragraph as bellow.
"Screwed connections are prohibited where threads provide the only seal of the pressure boundary."

I want to know why this requirement is applied.
And, this requirement shall be applied, is there any  code/standard that this requirement is addressed.

Best regards,

RE: Screwed Connection

The context is necessary to really evaluate the phrase.  Assuming that this pertains to piping or valves, the requirement includes flanges or welded end connections for the process connections.  Threaded ends are not acceptable.  The requirement would apply to the bonnet, another pressure containing connection.

RE: Screwed Connection

It is common for the first valve off of the pipe to be either welded or flanged (especially in services where there is H2S present).

If you need an isolation valve, for example for a PT, the first valve may be welded or flanged, then your gauge valve, then then the PT.

Is this your contex?

"Do not worry about your problems with mathematics, I assure you mine are far greater."   
Albert Einstein
Have you read FAQ731-376: Eng-Tips.com Forum Policies to make the best use of Eng-Tips Forums?

RE: Screwed Connection

Quote:

I want to know why this requirement is applied.

It's applied because threaded fasteners tend not to retain the pressure boundary.

Quote:

And, this requirement shall be applied, is there any code/standard that this requirement is addressed.

That depends on the type of application (service) and the country of installation.

Patricia Lougheed

Please see FAQ731-376: Eng-Tips.com Forum Policies for tips on how to make the best use of the Eng-Tips Forums.

Want to post an image? Look at the FAQ's in forum559: SolidWorks 3D CAD products

RE: Screwed Connection

Quote (cityone1):

"Screwed connections are prohibited where threads provide the only seal of the pressure boundary."

I want to know why this requirement is applied.
And, this requirement shall be applied, is there any  code/standard that this requirement is addressed.

Well, to quote ASME PCC-2 2006, Article 2.3: When the convenience of a threaded connection is desired, and the reliable seal of a welded connection is required, a seal welded threaded joint is sometimes used.

Seal welding is also addressed in ASME B31.3 and probably the other B31.x codes...

jt

RE: Screwed Connection

Sounds like the requirement eliminates NPTF joints where thread interference is the only fluid seal.  Other joints are permitted where the thread, if used, is not the pressure seal or the only pressure seal.

Ted

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources