INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete finish

Concrete finish

Concrete finish

(OP)
Concrete that was poured and vibrated with a vibrating poker on a dry Friday had by Saturday shown bad patches where concrete surface seemed to have peeled very badly.  The surface of the footpath was covered in a light dust which had brushed off the surface of the concrete.  I am trying to determine if this laitance is the fault of the concrete supplier or the concrete finishing crew.  The same crew had poured the previous sections of footpath with no problems with concrete from the same supplier.  I have requested batch results from the supplier but am almost certain they will come back with no fault to the concrete supplier.  
Has anyone any practical advice on the causes of laitance as I need to determine the source of the problem.   
Thanks

RE: Concrete finish

My take on this would be the finishing crew.  Perhaps, being Friday, they didn't stick around long enough to remove the bit of laitance that would come a bit later in the curing process (say within the hour or so).  I had this so many times in India - you explain the need to remove the laitance but hardly ever was done - and you get the same peeling/dusting.

RE: Concrete finish

could be that the surface dried out before it could hydrate...  or the finishing crew used a lot of water before the concrete set up.  both could [may] cause dusting and failure of the surface.

RE: Concrete finish

Occasionally a concrete finishing crew will "powder" the surface of a slab that is setting up slow or the aggregate is not pushed down enough.  They want a creamy surface for the final finish normally this is worked to the surface with a magnesium trowel then they run a steel trowel over the surface for the finish.  They can cheat and throw dry cement on the surface and work it in a little.  Much less shoulder work.  Yeilds a nice ceamy easy to finish surface.  That surface is usually weaker and prone to pealing and spalling. Just an idea.

Jason

RE: Concrete finish

(OP)
It turned out that the crew didn't stay as late as they originally said and that it did in fact rain that evening which caused the damage to the surface.  Thanks for your input everyone.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources