INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tilt-up hooked dowels

Tilt-up hooked dowels

Tilt-up hooked dowels

(OP)
For tilt-up wall panels (especially 5.5" ones), how would you typically provide hooked dowels to the slab pour strip (or to a concrete mezzanine floor if needs be), since the hook development length is too long? It seems like a commonly overlooked error - even the TCA engineering manual shows it this way. Epoxy dowel development lengths are shorter but the contractor won't be happy about all that drilling. Thanks for your thoughts on this.

RE: Tilt-up hooked dowels

never designed one. on welding inspections and rebar inspections i've seen

the majority of the slab is poured to give a surface to cast the panels on. a ~4 strip along the edge where the slab isn't cast along the perimeter. 90 degree hooks are cast in the wall with the development length hanging out in the air perpendicular to wall.  the exposed rebar is cast into the additional floor strip of concrete after the roof-steel is done.  it's been a while since i've seen one, i'm sure someone else will have better design answers.  I think i recall seeing one project have walls cast with mechanical splice ends to screw into.

-dsg

RE: Tilt-up hooked dowels

The hook doesnt need to be vertical, it can be horizontal.

csd

RE: Tilt-up hooked dowels

Hook or cog? Hook has 180 deg bend, cog has 90 deg bend.

RE: Tilt-up hooked dowels

Hooks can be either 90 or 180 degrees.  Full development strength can be obtained with mechanical or welded cross members to the rebar in question.

RE: Tilt-up hooked dowels

I think all you can do is note that you cannot develop those bars.  As you noted, you can't get the minimum development of 6 inches in a 5.5-inch wall.    

I think it gets boiled down to engineering judgment in the end.  An allowable stress approach may provide a rational method  since, if you cannot develop the yield strength, it doesn't make much sense to use an ultimate- or limit-state approach to the strength of the dowels we're discussing.

RE: Tilt-up hooked dowels

Does ACI allow you to use cross bars inside the hook to help develop the stress. I know that some other codes do.

csd

RE: Tilt-up hooked dowels

Welded cross bars of equal diameter can develop the rebars per ACI 318-05 Ref. 12.1.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources