Where can I read about good rules of thumb for spacing control joints/construction joints in a slab on grade...where, how often, etc?
Thanks.
Thanks.
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
control joints spacing resource
|
RE: control joints spacing resource
For sog with reinforcement, there is the subgrade-drag-method equation describing the required area of steel to hold the cracks tight.
RE: control joints spacing resource
After several problems with floor slabs on grade, I don't think that there is anything like a "rule of thumb" for floor slabs.
Metezger/McGuire web site has some helpful information.
There is a publication "Design of Slabs on Grade" [ACI Committee 360R-94].
Guide for Concrete Floor and Slab Construction ACI 302.1R-04
ARMY TM 5.809.12 / AIR FORCE AFM 88-3 chap. 15