INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Property Line Footing Problem

Property Line Footing Problem

Property Line Footing Problem

(OP)
I am working on some CMU houses that are going to be constructed with about 1" of separating between their "property line walls".  The structures are totally separate except for measures taken to keep water from getting between the two walls.  The builder would like to use a continuous footing with about a 2’ high stem wall then have the 4” slab-on-grade poured (slab and stem wall poured together).  We would then go up with the rest of the CMU wall from there.  My problem is that I have to put the 8” CMU stem wall on the edge of the footing and this results in a soil bearing failure.  The load is about 4.2 kips/ft.  I suggested that we pour the footing and slab monolithic and design it as a mat but this is not going to be ideal for their construction process.  Does anyone have any ideas on how I can make the stem wall with the wall on the edge of the footing work?   

RE: Property Line Footing Problem

Take out the overturning moment on the footing with a moment-couple. The top force of the moment-couple would go into the slab. Provide a dowel into the slab to resist the tension. Check slab for tension and reinforce as required.

RE: Property Line Footing Problem

Jike's method depends on the passive pressure of the soil on the side of the footing providing the compressive force in the couple, which may or may not work.  Another method may be to make the effective width of the stem wall greater by adding counterforts, thus better distributing the footing load to the soil.

Another method would be to improve the bearing capacity of the soil at the property line by soil stabilisation or some other method.  

RE: Property Line Footing Problem

Size the footing so that the bearing pressure works.

RE: Property Line Footing Problem

The simplest approach for the bottom force of the resisting moment-couple is the shear developed at the bottom of the footing due to the weight of the wall times the coefficient of friction. Usually this is sufficient.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources