INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Underground electrical duct bank (de-rating??)
2

Underground electrical duct bank (de-rating??)

Underground electrical duct bank (de-rating??)

(OP)
I have sched 40 rigid PVC (NEMA TC-2) underground duct bank buried in sand.  Double tiered, some 6", some 4".  It was buried mostly touching both vertically and horizontally.  (no cradles were used) Some places it is wired to re bar with the wire completely encircling individual and/or multiple ducts.  I have duct bank crossings
(East/West--North/south) interseting that are physically touching.  There is up to 3.5' grade differences between vaults.  (yea, standing water and sand)  I don't know much about, and am having a hard time referencing de-rating factors.  Voltages are 15 KV, 5 KV and 480 V.  What do you guys think about this?  By the way, I appreciste your input to my last thread.

RE: Underground electrical duct bank (de-rating??)

Look at the IEEE Brown Book, it has a section about duct bank rating studies.

RE: Underground electrical duct bank (de-rating??)

That is what cable ampacity software is for. I would strongly recommend that you either purchase a program capable of doing the calculations you describe or hire someone who can perform them for you. Some cable manufacturers offer that as a service. To try and perform the calculations you describe by hand would be difficult at best. The better cable ampacity programs like CYMECAP will also you to run different scenarios and get a reasonable estimate of the performance under various conditions such as the one you have described. It is standard practice at the company I work at to run cable ampacity calcs for all underground feeders.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources