should engineers stamp preliminary plats, or should this work be done strictly by land surveyors.
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: preliminary plat
RE: preliminary plat
Permitting negligence can fall back on the CE of record (assuming permitting is part of the scope of work in your contract). The stamp should symbolize the completion of both the engineering design and the permitting process. Permitted drawings should stay as presented in the records of the permitting body. the engineer gets no benefit from "bait and switch" permitting since the permanent record exists. Tell the person who wants it that.