INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ponding

ponding

(OP)
Hi

AISC has two design procedures for ponding.  One is for a case where there are flexible primary and secondary members.  The other is for when there are flexible secondary members bearing on a wall (infinitely stiff primary member: Cp=0)

What happens if you have roof joists bearing on a flexible joist girder at one end and a concrete wall panel at the other end?  Let's say the water is going to pond at the concrete wall.  Do I follow the procedure that assumes the primary member is infinitely stiff?  Or do I maybe assume the primary member stiffness (Cp) is an average of the joist girder stiffness (Cp=x) and the wall (Cp=0)...i.e. Cp=x/2.  

Thanks.

RE: ponding

I'd do your latter suggestion - run both analyses and know that you fall between them somewhere, probably half-way.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources