INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Portal frame in pre-engineered building

Portal frame in pre-engineered building

Portal frame in pre-engineered building

(OP)
I am looking at adding a mezzanine in an existing  pre-engineered steel rigid frame building. I only have erection drawings of pre-engineered building and there is no way to contact the original pre-eng. office.

Can anybody clarify the followings:

1. Why is there a portal frame along the perimeter? what is the reason to have this?
If it is for resisting lateral loads, then how it is attached to main building. The drawings I have shows portal frame within the bay (about 1'2" away from main columns on either side)of lesser height than main building roof height.

2. Can I rest my mezzanine beam on one of the portal column (weak axis) or not. Is there any stability issue if I use portal frame column.

RE: Portal frame in pre-engineered building

The portal frame is for stability of the building to resist lateral loads.  It is common to locate it so that it does not interfere with the base plate on the main column, so that is probably why you have the 1'-2 dimension.  There will be a connection at the top of the portal frame to the main column to transfer load from the building into the portal.

I would recommend keeping the mezzanine framing independent of the building, or you must take responsibility for the stability of the building also.  

RE: Portal frame in pre-engineered building

(OP)
MikeE55,

Thanks for the reply. The building was designed originally to have load capacity for some future mezzanine.So, the building can carry the mezzanine additional load. What I am not sure is about the portal. The portal members are all  WF 8" and will there be any stability issue with portal or not.

RE: Portal frame in pre-engineered building

Maybe.  Maybe not.
What is the wind load?  What is the seismic load?  What load is being resisted by the portal frame?  What is the elevation of the portal frame?  How is the portal frame beam and column connected?  What is the vertical load from the mezzanine framing?  Do you expect the mezzanine to be supported laterally by the portal frame columns?  What lateral load will be resisted?

RE: Portal frame in pre-engineered building

Portal frames in sidewalls are practically always a part of the main lateral force resisting system in the direction parallel to the ridge.  Don't mess with it.  The fact that it's 8" doesn't mean anything because they probably used H/60 or H/90 for the drift limit.

Even if the existing bldg was designed for a mezzanine, was that under an old bldg code?  If so, the seismic load is probably so much more now that it won't work.

One of the others recommended making it independent.  That's the way to go, IMO.

RE: Portal frame in pre-engineered building

(OP)
Thanks everybody.

We are going to make the mezzanine independent.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources