INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hydro test

Hydro test

Hydro test

(OP)
Can anyone explain the meaning behind between UG-99(c)?  When would you use this paragraph instead of UG-99(b)?

RE: Hydro test

I have never seen this before, but, after reading the Appendix L example as described below, I can see the advantage.

UG-99(c) can be used to gain an advantage for a vessel calculated in an uncorroded condition when determining minimum metal temperature to be used only during the Hydro/Pneumatic testing as described in Appendix L-9.2

Also see Figure UCS-66.2 General Note 6

There are three kinds of people in this world; those who can count and those who can't.

RE: Hydro test

Correction to above.........Appendix L, Paragraph L-9.6.2

There are three kinds of people in this world; those who can count and those who can't.

RE: Hydro test

The "calculated pressure" is what I was taught is the MAP (N&C) or Max Allowable Pressure (New and Cold). If you take the philosophy that a vessel should be stressed more in the shop than it ever will in the field then you have to use MAP as the test basis.

I'll throw out an example: Take a shell fabricated of 0.50" SA516-70 with a 0.25" corrosion allowance at say 200°F with a diameter such that the stress at MAWP is exactly 20 ksi. The MAWP will be half of the MAP since in the N&C condition the shell is twice as thick. At N&C if you pressurize to MAWP the shell will be stressed to 10 ksi. So if you test to 1.3*MAWP you'll stress the shell to 13 ksi. But at the end of life of the vessel, as the shell has corroded to its retirement thickness of 0.25", the stress in the shell will be 20 ksi. The 13 ksi stress at hydrotest in the shop is less than the 20 ksi stress the same vessel will see in the field.

On the other hand, a hydrotest pressure of 1.3*MAP will stress the shell to 26 ksi, thus more than the vessel will see as it approaches retirement.

Yes, most vessels will not be as extreme as my example, but hopefully it makes my point clear. Obviously as the new thickness to corroded thickness increases the situation get exaggerated. As an owner/operator, which would you rather have?

jt

RE: Hydro test

(OP)
Thank you both.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources