INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Routing - Issues with Pipe Specification

Routing - Issues with Pipe Specification

Routing - Issues with Pipe Specification

(OP)
I created some fittings to mimic slip fit plastic(PVC) fittings to use with the routing package.  I am getting this strange problem.  I start a route and I select Schedule 80 CPVC pipe.  It then creates a section of pipe, Sch80 CPVC.  OK.
Now, however, If I drag and drop a TEE, Sch80 CPVC, it creates two new pipe lengths and the problem is these new pipe lengths are Sch80 PVC instead of CPVC.

What do I need to look at in the fitting to make sure it keeps the base pipe configuration?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.