INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Water Distribution Plan & Profile

Water Distribution Plan & Profile

Water Distribution Plan & Profile

(OP)
What is everyone's thoughts on what information should go in the plan view and what should go in the profile.  I'm talking about calling out bends, tapping valves, fire hydrants, joint restraint, concrete anchors,etc.  I've always put in the plan view what was visible in the plan view and put in the profile what was visible in the profile.  Some jurisdictions require the same information in both places which seems to me to be confusing when there are bends that can be seen in the profile but not in the plan view.

RE: Water Distribution Plan & Profile

Qouting myself:

"If you want to guarantee conflicts between plans and specifications, or between different sheets of the plans, then, by all means , repeat dimensions, notes details and other elements !

At first, we may think that repeating things will help to clarify them and emphasize their importance. But there is a trap here which is all too easy to fall into. Consider this common scenario. You are preparing plans for a retaining wall which is to be 10 feet in height. There are several sheets to the plan set and the wall appears on three of them. Each time the wall is shown you dimension and label it using the 10 foot design height. Late in the design process, when deadlines loom and conditions are at their most hectic, you discover that the wall needs to be 12 feet high. So you hastily redesign and change the plans accordingly. But you overlook one of the three sheets ! Now you have created a conflict. Sheet 5 does not agree with sheet 7. Your contractor doesn't know which is correct and you now have the additional duty to correct this error and possibly issue a change order for increased costs. As you know, these are never a welcome sight to your client or employer."

good luck

The best rule here is to say it once and say it correctly. Don't repeat things if you don't have to. Changes always occur and small oversights like this can and will happen.

RE: Water Distribution Plan & Profile

The only reason I see for drawing profiles for water distribution pipes is to identify crossing conflicts, washouts and air valves (you may not have these on a distribution pipe.  

I agree with RWF7437 – as far as possible only show information once.

Over recent years I see the majority of profiles drawn in straight lines with pipe gradients shown. The pipe is flexibly jointed and what the designer really wants is the pipe laid to smooth vertical curves with the minimum amount of deflection on each joint. What he doesn't want is what he has drawn i.e all of the joint deflection pulled at one joint at the apex or the valley. So why are we drawing profiles that do not reflect what we want the contractor to build ?

Flummoxed !!



Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources