INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

SA234 WPB

SA234 WPB

SA234 WPB

(OP)
ASME BOILER & PRESSURE VESSLE CODE II PART A - FERROUS MATERIAL SPECIFICATIONS, SA-234, Para 7.5 states: Liquid quenching followed by tempering shall be permitted for all grades when approved by the purchaser.  

I have a recieved a request to accept some material that has been manufactured this way.  I checked the mill test report and all data meets the requirements of SA-234.  I'm inclined to accept the fittings, but I'm cautiously curious why does the spec require that this be approved by the purchaser?  Am I missing something?  Any problem with liquid quenching fittings?

RE: SA234 WPB

No, you are not missing anything. Liquid quenching may be required to allow for thicker parts or components, which have limited hardenability, to be tempered after quenching to achieve minimum mechanical properties for the specification. The reason Purchaser approval is required is more for cautionary purposes related to distortion concerns for certain grades of steel, and because liquid quenching costs more as part of the heat treatment cycle.

RE: SA234 WPB

It's also a two stage process with more to go wrong plus it may have knock on effects for welding if PWHT is involved.

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

RE: SA234 WPB

SJones,
I don't believe there would be welding issues with PWHT unless impact testing is required.

RE: SA234 WPB

What about PWHT temperature in relation to tempering temperature?

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

RE: SA234 WPB

It's true that it is standard to specify a PWHT temp lower than the tempering temp, but, it seems that in the case of this material, it would be more of an issue if impacts are required.  

RE: SA234 WPB

It has not been uncommon for manufacturers to "sweeten" the mechanial properties through Q&T as well as use it for thicker parts to meet the mechanical properties as stated by metengr. Unfortunatly, that "sweetening" may not prove so useful to the Purchaser when the fitting is welded and placed into service.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources