INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Additional welding after PWHT

Additional welding after PWHT

Additional welding after PWHT

(OP)
Dear Engineers

I have a quck question about additional wleding after PWHT
and Hydro test completely.

present situation is as follows.
In a  vertical pressure vessel of ID3000mm, shell Thk 17mm
herewith, one of Internal supporter (T10mm x 50mm) was attached with 8mm fillet welding and then, this support was revomed as per client requirement.

In this condition, client ask for additional requirement as follows as per their precess requirement.
- PWHT again
- Hydrotest again.
However, this requirements is not related to ASME requirement, but only for process condition.

RE: Additional welding after PWHT

As you did not specify the material of the vessel, the filler metal used, nor the service conditions (temperature), and if the removal was done by flame cutting or by grinding it is difficult to say what is the real need for PWHT.

http://www.welding-advisers.com/

RE: Additional welding after PWHT

cmryu,

Was there additional welding or grinding on the VESSEL SHELL after it has been postweld heat treated & hydrotested?

RE: Additional welding after PWHT

(OP)
For the additional information, this vessel material is of A516-70, and Design temp is 160 Deg. C, Process condition is NACE and Sour service for this vessel.
This internal stiffener was attached after PWHT and Hydro Test, and then this stifferner was removed again by Grinding.

RE: Additional welding after PWHT

IF this vessel has already been ASME Code stamped and is in service, I would locally PWHT the base metal heat affected zone from the welded attachment. I would not perform a second hydrotest, there is no benefit to be gained from it.

I would also mandate an NDT (like wet fluorescent MT) of the base metal heat affected zone after local PWHT, in lieu of a hydrotest.

IF this vessel is under construction, and before ASME Code stamping, you will probably need to PWHT the base metal heat affected zone, and perform a second hydrotest to apply the ASME Code stamp.

RE: Additional welding after PWHT

(OP)
this vessel is not rewuired ASME code STAMP.
Is it also required Local PWHT and Hydro test again.?

RE: Additional welding after PWHT

(OP)
As per UCS56 in ASME, less than 13mm throut length of weld , PWHT is not required, but Client is asking for PWHT and Hydro test again due to precess requirement.
Process requirement is only for NACE and Sour service as we know.

RE: Additional welding after PWHT

cmryu,

I would do what your client is asking for. By welding on the vessel after PWHT, you have reintroduced residual stresses that might cause in-service cracking of the vessel.

RE: Additional welding after PWHT

I would perform the local PWHT per the clients requirements, but I would not re-hydrotest, if at all possible. Hydrotesting must be performed with extreme caution for components that have been installed for service.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.