INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Measuring pipeline construction productivity

Measuring pipeline construction productivity

Measuring pipeline construction productivity

(OP)
Hi all

Does anybody know any good references on measuring the progress of pipeline construction e.g measuring right of way , construction road , stringing etc

Best regards

m.taffish

RE: Measuring pipeline construction productivity

mtaffish

Nothing takes the place of experience, but that being said, John S. Page put out some very good reference books on cross country pipeline productivity factors.

They are pretty darn good, but again, site conditions are so site-specific, these factors will give you an idea if you are doing a conceptual or feasibility study, but based on my experience I would not use them for a detailed Class III type owvners estimate.

Also, there are many other factors that will affect productivity and those need to be taken into account.  

Used to be you could ask a pipeline contractor to put one together for you if you could gurantee he would be on the bid list.  The problem you will face now is that contractors are so busy now, it's impossible to get a "free" estimate these days.

Greg Lamberson, BS, MBA
Consultant - Upstream Energy
Website: www.oil-gas-consulting.com

RE: Measuring pipeline construction productivity

mtaffish

I just remembered, if you go to my website, there is a link to a document called "Construction Execution Plan Development Guidelines" (it's on the 2nd web page under publications), in one of the attachments to the PDF document there is some information on pipeline productivity factors that was taken from Page.  

If you can't get hold of a Page book, that might help.

Greg Lamberson, BS, MBA
Consultant - Upstream Energy
Website: www.oil-gas-consulting.com

RE: Measuring pipeline construction productivity

I assume you mean for progress payments.

And assuming that you mean a pipeline and not some short 1, 5 or 10 km job, there really only two that matter,  

1.) linear feet welded.
2.) linear feet buried.

Otherwise see the little diagram below.

http://virtualpipeline.spaces.msn.com

RE: Measuring pipeline construction productivity

Ooopps, may have missed the subtle difference between measuring and estimating productivity...........

Greg Lamberson, BS, MBA
Consultant - Upstream Energy
Website: www.oil-gas-consulting.com

RE: Measuring pipeline construction productivity

(OP)
Thank you Greg , I checked out the documents on your website and I know have an idea of what has to be done.


 

RE: Measuring pipeline construction productivity

mtaffish

Great, let us know if you need anything else.

Greg Lamberson, BS, MBA
Consultant - Upstream Energy
Website: www.oil-gas-consulting.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources