INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API plan for Fuel oil

API plan for Fuel oil

API plan for Fuel oil

(OP)
hi guy,

Can anybody recommend API flush plan for fuel oil.

RE: API plan for Fuel oil

If you provide some additional detail, it would help us to give you a helpful answer.  There are too many variables otherwise.

For a fuel oil pumparound pump in a crude unit, I might recommend API plan 11, flush off of discharge.  This assumes that the product is cool enough (vapor pressure margin) that additional cooling is not needed.  

For a charge pump to a fuel oil desulfurizer, I might recommend API plan 32, clean outside flush.  The flush would be the finished product (desulfurized fuel oil) from the other end of the unit.  These units often have flush systems piped up to flush a number of pumps with this same clean product.

For a charge pump to a distillate hydrotreater, we might have product that is hot enough to require cooling and outside flush might be more expensive.  So I might recommend an API plan 23, with circulation from the seal chamber through a cooler and back to the seal.  An API plan 23, circulation from an intermediate stage through a cooler and back to the seal, might be considered, also.

For a hydraulic recovery turbine on the outlet of a distillate hydrotreater, I would recommend no flush, with cooling water on a jacket around the seal chamber.  This is because this stream would be saturated with hydrogen.  Any pressure drop across an orifice would result in gas flashing out of solution.  So plan 11 or 21 would be a problem.  Plan 23 could be considered with great care on how it is flooded and vented at start-up.  

For a transfer pump of fuel oil product from a storage tank, I might recommend API plan 11 or 13 depending on the configuration of the pump.  

The recommendation for seal flush plan depends as much on the service and pump configuration as on the product.

Johnny Pellin

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources