Building a BOM
Building a BOM
(OP)
I am creating a BOM and I am assigning report symbols in the repeat region. In the report symbol dialog box what does the following mean?
rpt? and mbr?
Thanks
rpt? and mbr?
Thanks
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Building a BOM
See this link for more on tables
h
--
Fighter Pilot
Manufacturing Engineer