INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Arching rings on 400kV overhead lines

Arching rings on 400kV overhead lines

Arching rings on 400kV overhead lines

(OP)
Dear all. I want to place my question about the installation of arching rings on 400kV overhead lines. These rings are supposed to carry any transient overvoltage and try to break the air gap so they should be placed in the lower length between the live terminal and the earth. Can you give some pictures of these rings installation? On site the installation of the arching rings on the tension insulators are misplaced and as another result the chambers are fastened upside down.

RE: Arching rings on 400kV overhead lines

(OP)
HI Scotty and thanks for the pdf. n our plant the rings are not installed at the Step Up transformer bushing but on the tension insulators. he question is if they rings should be on the live part or upon the tension insulator. From what i read on the NGC pdf they rings should be installaed in such a way that the flash over will not affect the insulator or the bushing but will try to bridge the gap of the ring. Am i right?

RE: Arching rings on 400kV overhead lines

The grading ring is provided in the insulator to achieve better uniform voltage gradient distribution in the air external along the insulator. Corona shield is provided to screen the top metal work, to reduce corona at operating voltage and to improve the impulse performance.

Below is a link with representative cases.
http://cuky2000.250free.com/Insulator%20and%20Voltage%20Gradient.jpg

RE: Arching rings on 400kV overhead lines

Wow bacon.  A lot of eggs in that one basket!

Keith Cress
Flamin Systems, Inc.- http://www.flaminsystems.com

RE: Arching rings on 400kV overhead lines

(OP)
Hi bacon, thanks for the pic.
It seems that the corona rings are towards the insulators strings and not towards the active line as it happens on our site.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources