INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

A bom question

A bom question

A bom question

(OP)
i have a assembly with 3 configuration. with each following configuration i added new components. i am desiring to have 3 sheet with related configurations. BOMs of each sheet must show only the added components(not all components)and previous configuration name.

config A
parts  1,2,3
BOM    1,2,3

config B
parts  1,2,3,4,5
BOM    configA,4,5

Config C
parts  1,2,3,4,5,6,7,8
BOM    configB,6,7,8


Can anybody explain me how to do???

thanks  

with all respect

RE: A bom question

The best waywould be to use subassemblies instead of configs.

You can manyally edit the BOM to not display the other items.

batHonesty may be the best policy, but insanity is a better defense.bat
http://www.EsoxRepublic.com-SolidWorks API VB programming help

RE: A bom question

From my experience from several companies, they should be separate part numbers with their own separate dwgs. Using different configs to show different parts/assys obviously can cause grief.
If your company requires you to do it this way, I suggest what TheTick wrote.

Chris
SolidWorks 07 3.0/PDMWorks 07
AutoCAD 06
ctopher's home (updated 04-21-07)

RE: A bom question

(OP)
yes, i think my solution can be subassembly. Thank you TheTick and ctopher.. i will look for this..

when i started in business, i saw that they are using seperate  dwgs and separate partnumbers(seperate files) for showing a part's manufacturing operations..But i invited them to change this..


my first configA,
my parts are assembled and welded..
i need to show this assembly in a dwg..

configB
my assembly is Machining..so my parts have different dimensions and i will show them in seperate dwg.

configC,
iam inserting new components to my assembly.. and welding
so i need a seperate dwg..

****all dwgs are defining same part's manufacturing operations..
so all are same partnumber and there is ony an assembly file...


am i contemplating incorrect..???

RE: A bom question

If each stage of the assembly requires different assembly processes in different areas of the company, and is required to be tracked and stocked in those areas, then each stage should have its own number and matching drawing.

cheers

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources