INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

14 story braced frame shear reaction
2

14 story braced frame shear reaction

14 story braced frame shear reaction

(OP)
given a 14 story steel structure with braced frames (R=3), is there a method used to transfer shear from the columns to the foundation more often than others?

i am familiar with shear keys and aisc's stance on transferring shear through anchor rods, but was curious what others would do in this situation.

i'm not a fan of the shear key after seeing it constructed.  the tolerances for concrete are very different than steel and the bite of the key into the pier doesnt always work out the way it was intended.

i have considered welding plate washers with standard sized holes to the base plate, but wanted to hear some other opinions.

RE: 14 story braced frame shear reaction

We've used traditional anchor bolts used to resist the tension uplift.

For the shear we:
1.  Add embedded plates (with headed concrete anchors) on either side of the base plate, embedded in the top of the concrete.
2.  Welded vertical steel plates to tie the base plate edges to the embedded plates - just to take the shear.


RE: 14 story braced frame shear reaction

We use a similiar detail to JAE but everything is post-installed to the workers have to remember to put in embeds or get them in the right position.  

We just take L5x5 angles after the columns have been erected and prior to grouting, set them directly next the the baseplate, screw them into the foundation with Titen HD screw anchors or soemthing similiar, and weld the vertical leg to the baseplates.  The angles then serve as little side forms when they flow the grout in under the baseplate.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources