×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tie-in Metal

Tie-in Metal

Tie-in Metal

(OP)
Hello to All
My question today is. I been installing metal on furnaces - attic over heads and now some commercial jobs  My super asked me to try to call in the tie-in metal from the starter pieces that were placed in the curb before the units were set by the rig. To the metal which was installed about 10 feet away. Is their any software program out their where?
I can put in the cfm data, the location of the starter pieces and then the tie-in location
Were it can measure both supply and return fittings without them running into each other? Summer coming and it sounds like a lot of measuring will be heading my way.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources