INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

retain 20 m saturated sand

retain 20 m saturated sand

retain 20 m saturated sand

(OP)
I need to retain the soil for a foundation pit of depth 20m. The soil medium is a homogenous sand (SP-SM) and standart penetration values reach 30 at 10 meters and greater than 50 at 20 meters. The groundwater table is 6 meters from the ground.

The routine procedure in Turkey is to use tangent bored piles tied back by a series of rows of anchors.

However I have some doubts about the watertightness of tangent piles and another concern is the capacity of ground anchors in a saturated sand medium.

I would be thankful for any kind of recommendations.

RE: retain 20 m saturated sand

How about an anchored sheetpile wall?

RE: retain 20 m saturated sand

I tend to disagree with BigEasy as sheet piles for such a deep excavation tend to deflect quite a bit not to mention the difficulty in installation, increased requirement for anchorage, and the problem of leakage.  I would still favor the secant pile option; although it has its own problems, but it is a stiffer system requiring fewer rows of anchors, and localized leakage areas can always treated locally by injection.

Tsoft; www.tsoftonline.com

RE: retain 20 m saturated sand

You can use sheet pile wall and strut from the inside - many pictures of years gone by on this in books.  Also, you could use a circular sheet wall and use concrete rings on the inside for stiffeners - to keep from deflecting and add stability.  This is similar to the first comment but you would have no internal hindrances.  This was done on a very large project years ago in Buffalo as I remember.

RE: retain 20 m saturated sand

Soldier piles could be another option, this shoring alternative can use timber or shootcrete.

RE: retain 20 m saturated sand

hello.. i have a question aboout sheet piles.

i am designing a sheet pile that will serve as a "basin divider wall". when i am designing for the slope stability analysis, i would like to know is is there approach about how to define the path of the water under the sheet pile and on the other side of the wall.

This case is assuming one basin is full and the other basin is empty, i have had problems about how to define or approximate the path of the water in the zone that is for the empty basin.

please reply

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources