INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ERECTION PROCEDURE FOR BOILER STACK

ERECTION PROCEDURE FOR BOILER STACK

ERECTION PROCEDURE FOR BOILER STACK

(OP)
Dear all guys,

We have been performing project Built a Water Tube Boiler Cap.110 ton/h, specification standard refer to ASME. In near future we will erect the Boiler Stack, nevertheless I have still to prepare the Erection Procedure for Boiler Stack. If any guys have a standard procedure for this activity, would you please to give me that standard, or if any guys know the references of this erection procedure, please inform me so I can seek that references. For information, the stack total heights is 61M and diameter 2.2 M. Status now, stack already finished fabrication and separated in 6 segments.

Thank you and appreciate for attention and respect for your reply.

Regards

Ari Dwikoranto    

RE: ERECTION PROCEDURE FOR BOILER STACK

I am not a boiler erection expert, but I can tell you that I had a stack designed recently and one of the analyses that was conducted was erection stresses. If you didn't design the stack yourself, I would recommend that you ask the designer to specify an erection procedure.

RE: ERECTION PROCEDURE FOR BOILER STACK

cilacap,
With all due respect, I do not think you should be writting an erection procedure for a stack.  If you have to ask such a basic question, you may not be the best qualified to do write this procedure.  I suggest you find someone with some hands-on experience.

Joe Tank

RE: ERECTION PROCEDURE FOR BOILER STACK

Typically, the company actually doing the erection is the one that would come up with the procedure.  The general method is "Lift piece into place, weld, repeat".  It is the details that require some thought, and the details would vary according to who did it, the size of cranes available, the type of scaffolding available, etc.

RE: ERECTION PROCEDURE FOR BOILER STACK

start at the bottom?

RE: ERECTION PROCEDURE FOR BOILER STACK

My company specializes in stack design, and the earlier posts are correct.  You need to know how the stack was designed to be lifted, before a procedure can be written.  The lift procedure is usually prepared by the company performing the lift, but they take into consideration the way in which the stack was designed to be lifted.  For example, even though the stack was shipped in 6 pieces, it may have been designed to have 2 or more sections welded together and lifted as a single unit, to minimize welding in the air.  

Thanks,

Chris
www.mecaenterprises.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources