INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME BPVC cyclic pressure to vacuum loading

ASME BPVC cyclic pressure to vacuum loading

ASME BPVC cyclic pressure to vacuum loading

(OP)
I'm working on a design for a pressure swing adsorber system (PSA) to separate CO2 from my product stream.

The vessel has been used so that very few pressurizations would be done in its operational life.

During the adsorbing time, the vessel is running at 130psig.
During the desorbing time, the vessel may go as low as -5psig.  
I expect 26,000 cycles (0,130,-5,0 psig) per year.
The vessel is made of AISI 304L SS.
It needs to meet requirements of the ASME Boiler and Pressure Vessel Code.

I'm having trouble identifying what part(s) of the code deal with this sort of thing. Specifically, any parts of the code that deal with pressure cycling are of interest.

I have been working with various parts of Section VIII Division I, but I'm starting to suspect that I'll need to get Section II or III.

RE: ASME BPVC cyclic pressure to vacuum loading

some-

Take a close look at VIII Div 2 App 4 and 5... This approach is generally acceptable for use on Div 1 vessels.  But hire an experienced hand to help you out until you have developed some personal experience...

jt

RE: ASME BPVC cyclic pressure to vacuum loading

(OP)
What I meant to say in my last line was;
"I have been working with various parts of Section VIII Division I, but I'm starting to suspect that I'll need to get Section VIII Division II or III."

jte, thanks for the suggestion.

RE: ASME BPVC cyclic pressure to vacuum loading

JTE is right.
VIII Div 2, App 5 provides guidelines for fatigue analysis.  However, pay you most attention to all welds where stress concerntration has always been the fatigue initiation point.
If you want to take a consevertive approach, PD5500 may be an easier method.

Henry Kong, P.Eng

QuestAir, A fast cycle PSA manufacturer

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources