INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Laterally loaded concrete pile

Laterally loaded concrete pile

Laterally loaded concrete pile

(OP)
I posted this in the concrete pile forum, but not sure how many structural users make it over to that forum??  Any help is greatly appreciated

2 story house on the beach. 120/C/Enclosed.
Finish Floor @ 18' (based on Base Flood Elevation)
Existing grade @ 9'
Scour to 5.5'
Using the Coastal Construction Manual, point if fixity is 8.5' below the localized pile scour (2'-8" based on 2x the diameter of a 16" pile).
So that leaves me with a 23'-3" cantilevered pile.  I ran my design and I am coming up with a 24" diameter pile w/ (12) #7's.  
The builder I am doing this for built a house a few houses down (same grade/scour/etc.) and the previous engineer specified a 14" dia. pile with (6) #6 verticals.
So now I'm scratching my head.  Either the previous engineer did not design for any flood loading which is much greater that the lateral wind load, or he assumed the column to be fixed at the top or even fixed at the scour depth (thus the column being ~11' shorter).
My question is, am I correct to assume the column is not fixed at the top?  The floor system will tie in ~50 piles supporting the floor beams.
I DON'T WANT TO BE THE "OVERKILL ENGINEER"!!
Any suggestions would be greatly appreciated.  Heck, requests of consultation fees for quality feedback would even be considered.

RE: Laterally loaded concrete pile

How are the piles connected to the "floor system"?
If you are developing the pile steel into, say, grade beams and, the beams are sized to carry any moment transfered from the piles ( a concrete frame, basically) then, the pile heads are FIXED. They are free to "translate" (all of them, like columns in a story) but not free to rotate. A fixed head.

Otherwise, from what you have explained, you are designing the piles for their tributory loads (axial and lateral) and with due regard to what has been prescribed as the point of fixity in the absence of any nonlinear analysis, which is the logical approach.

 

RE: Laterally loaded concrete pile

I have to add an explanation to the first paragraph of my post;

the pile heads' lack of rotation (or amount of rotation) if the system is solved as a frame, will depend on the relative stiffness of the members connected at each pile head.

It would, still, result in smaller size piles compared with free head condition.

RE: Laterally loaded concrete pile

(OP)
Thanks FM1,
I have been buried in the NDS for far too long.
I need to determine the effective length of the column based on the relative stiffness of the column and intersecting grade beams.  Then size the column fixed top and bottom with that adjusted length.
How do the load positions move when the column length is adjusted (I'm assuming proportionally?).
Thanks again

RE: Laterally loaded concrete pile

I would run a FEA model with equivalent lateral soil springs (horizontal subgrade modulus). The bending moments in the pile and the head deflection are a function of of the soil stiffness, the cracked stiffness of the pile and the BC's (i.e. fixed head or pinned head).

The soil stiffness is non-linear (P-y curve stuff) but you are likely not going to allow enough deflection to sweat this too much.  Doing a non-linear FEA on soils properties known to ONE significant figure is putting lipstick on a pig.

Get some help from your geotechnical engineer with this.  In the soils reports I see, in order to ignore group action effects, piles need to be placed 8 diameters apart.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources