INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Structural Design of laterally loaded piles.

Structural Design of laterally loaded piles.

Structural Design of laterally loaded piles.

(OP)
2 story house on the beach. 120/C/Enclosed.
F.F. @ 18' (based on BFE)
E.G. @ 9'
Scour to 5.5'
Using the Coastal Construction Manual, point if fixity is 8.5' below the localized pile scour (2'-8" based on 2x the diameter of a 16" pile).
So that leaves me with a 23'-3" cantilevered pile.  I ran my design and I am coming up with a 24" diameter pile w/ (12) #7's.  
The builder I am doing this for built a house a few houses down (same grade/scour/etc.) and the previous engineer specified a 14" dia. pile with (6) #6 verticals.
So now I'm scratching my head.  Either the previous engineer did not design for any flood loading which is much greater that the lateral wind load, or he assumed the column to be fixed at the top or even fixed at the scour depth (thus the column being ~11' shorter).
My question is, am I correct to assume the column is not fixed at the top?  The floor system will tie in ~50 piles supporting the floor beams.
I DON'T WANT TO BE THE "OVERKILL ENGINEER"!!
Any suggestions would be greatly appreciated.  Heck, requests of consultation fees for quality feedback would even be considered.

RE: Structural Design of laterally loaded piles.

Design for fixity at the top of the pile with L bars, cost effective way to decrease "k".  All concrete is not equal (5 ksi vs 3.5 ksi), the number of smaller piles may be larger than the number of your larger diameter piles for equal resistance to lateral forces.  Scour maybe prevented with large riprap with concrete infill, (or reinforced pavement with turndowns).  Comparison is educational but not productive!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources