INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

400kV disconnection sequence

400kV disconnection sequence

400kV disconnection sequence

(OP)
Dear all. On iste we have a three winding step-up transformer connceted to the grid of 400kV via a disconnector and a circuit breaker. The disconnector is between Step-Up transformer and circuit breaker. When we de-energize from the 400kV grid we are instructed to open first the circuit breaker and then open the disconnector in a period of 10 seconds maximum after the opening of the circuit breaker. I cant quite understand this logic. Can you help me on that?

RE: 400kV disconnection sequence

In contrast to circuit breakers, standard disconnect switches are designed with very limited or none interrupting capability. Therefore, circuit breakers should be open first and let drain the trap charges current stored in lines and other part of the system.

The reconnection sequence should be in reverse mode, first open ground switches (if any), close phase switches and then close circuit breakers to connect the system. This should be consider even for energize unloaded transformers and transmission lines.

Even thought some switches may be  equipped with attachment such as arching horn, Quick-break whip device or vacuum interrupters to provides limited load-break capabilities the primarily function of disconnect switch is for visual isolation of energized parts.

See the enclosed link video of a 115 kV disconnect switches equipped with some of the attachment described above:

http://video.google.com/videoplay?docid=-2696382918978422965&;q=disconnect+switch

RE: 400kV disconnection sequence

(OP)
Dear all, my main concern is not if i open first the breaker and then the disconnector, i know that. My concern is when i open the circuit breaker if i have to open immediately the disconnector (in a period of 10 sec) as per manufacturer recommendation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources