Piled Foundation on Embankment
(OP)
Is it possoble to do secant bored piled walls on the side slopes of embankment AND a diaphragm wall in the centre of the embankment??
The embankment is 10m wide and 6m high??
The embankment is 10m wide and 6m high??





RE: Piled Foundation on Embankment
RE: Piled Foundation on Embankment
RE: Piled Foundation on Embankment
The central walls are designed to support a bridge deck. After the bridge deck or the wall has been in place, a section of the embankment is removed and a new road will be contructed