INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

What is the process of grading a steep jungle mountain road
6

What is the process of grading a steep jungle mountain road

What is the process of grading a steep jungle mountain road

(OP)
I am in hawaii and need to make a road through steep jungle with large and small boulders. The road from lot "A" (bottom) to lot "B"(top) has an elevation change of about 45 feet and the distance is about 135 feet.There is about 40 feet in width to work with. I want to keep it legal(permits, etc.) and keep costs down. What is the process to get this project off the ground properly and quickly?

RE: What is the process of grading a steep jungle mountain road

What purpose will this road serve?  You are talking a 33% grade which is excessive.

RE: What is the process of grading a steep jungle mountain road

(OP)
The owner wants to build a house on lot "B". Lot "B" is a nice, big and relatively flat lot which was cleared of trees a few years ago. There is a kicker-the owner started a road (no permit) on his own and boulders rolled into a city & county councrete drainage ditch. The neighbors called the building dept. and he is going to get fined. My license qualifies me to get involved but I am looking for advise on rectifying the problem. I want to approach the owner with a plan?

RE: What is the process of grading a steep jungle mountain road

A series of retaining walls and 7 each 180 degree hairpin curves could produce a 7' wide drive at 14% grade.  The centerline distance is 340' and the inner radius curve is 6.5'.  This is undriveable unless using a short wheelbase golfcart or jeep.

RE: What is the process of grading a steep jungle mountain road

Why not park the vehicles at the bottom and use a "chair lift" to get people to the top?

RE: What is the process of grading a steep jungle mountain road

How about positioning the parking and garage below the house into the side of the hill, this would eliminate 10' of fall or so. Build steps up to the house or first floor from there.  Also, combine  this with meandering the road as much as possible across the 40'.  If you do both you may get the road grade down to a more reasonable 20%, yeah its still pretty steep, but 15-17% is accepted in most jurisdcitions I work in, and you are in a "jungle" after all.
 

RE: What is the process of grading a steep jungle mountain road

(OP)
So far the chairlift is the easiest idea i've heard and the funniest too. The parking garage is a great idea but i need to make a road so i can haul material up to build the house on the upper flat lot. We should be able to push boulders and dirt from the road area to the flat lot and achieve 17% or less. What is the sequence in arrangeing the personnel needed? Do we get a topo survey first then get a geotech to analyze the soil? How is it usually done? Can one organization do it all and tell us if it's feasible?

RE: What is the process of grading a steep jungle mountain road

The garage idea is good but that will still leave you with a 26% grade assuming you are not meandering the drive.  It might be worth looking at the legal aspect of building something this steep.  Will you be liable when little Johnny loses control of Mom's hummer at the bottom of the drive?  That being said, I would certainly have a topo survey done so you have a grasp of the material volume that needs to come out.  Soil samples should be taken to detrmine bearing capacity and your road sub-base can then be designed.  You may want to toy with the idea of having a small crane on site set up on level area lower than the final building location.  This would allow a lesser grade for the trucks delivering material.  

RE: What is the process of grading a steep jungle mountain road

Check local Zoning.  Here in PA, USA, it is pretty universally prohibited to disturb slopes over 20%.  Yes, you can sometimes - and sometimes you can not - get relief from this.  But you want to know that before you begin what is sure to be an expensive design.

Engineering is the practice of the art of science - Steve

RE: What is the process of grading a steep jungle mountain road

How big is the the house lot up above?  Is there room for the driveway to come into it in a 'cut' situation and loop around to add length? And to increase the starting grade going into the 135' "road" section by filling in the lower lot?  The house could also have a lower level garage, which would also save 7 or 8 feet in elevation change.

Any way you look at it I don't see it being inexpensive so I hope the views are worth it.  And you shouldn't bother getting too much further without an accurate survey.

RE: What is the process of grading a steep jungle mountain road

(OP)
The lot above is huge and there is room to cut like you suggest. As well as, increase the starting grade. I appreciate your input, Do you know where i can get a BMP (best management Plan) manual?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources