INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Simple Grading of Swale

Simple Grading of Swale

Simple Grading of Swale

(OP)
I have always had trouble with this:

I am grading a swale with say 3:1 sideslopes and say 1% grade along the bottom of the swale. Let's just say it is 100 feet long.

Does anyone have any helpful tips on accurately grading a swale? If you've done it, you'll know what I am talking about.

RE: Simple Grading of Swale

Earthwork is usually to +/- 0.1" foot. More accuracy may be had by bluetopping with hubs, (as per highway construction).  The few puddles and ponds left from normal grading practices while building swales is acceptable and reasonable.  If you want more positive drainage, then pave the bottom.

RE: Simple Grading of Swale

Use a level and grade it at 10ft intervals.  

For the slight ponding your bound to get, once the grass grows it won't show.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources