×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Conveyor time calculation

Conveyor time calculation

Conveyor time calculation

(OP)
I have a conveyor calculation problem.
My con' travels at 38 metres/min, this is loaded with boxes 100mm in length at the rate of 20 boxes a minute. I have to build up 195 of these boxes which butt up against each other before the conveyor release's, how do i work out how long that will take ?

RE: Conveyor time calculation

Sounds to easy

195 boxes divided by 20 boxes per minute = 9.75 minutes

Russell Giuliano

RE: Conveyor time calculation

No help with schoolwork.  Do it yourself.

Be an engineering student, not a plagarizing freeloader.

The world has too little of one, too much of the other.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources