INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Chiller selection

Chiller selection

Chiller selection

(OP)
i have this doubt in designing side.

this chiller will be employed for printing press machine.
Tonnage calculated by HAP gives 3 TR load of heat removal.

what i need is...   How to select  or calculate the cooling coil.

 No.Rows, Area,and length for 3TR chiller?

After searching in my library I got a hold of a FCU brochure... with this details.
 
No of rows =
 tons x 12000 / ( u x LMTD x face area x area entountered in the counter flow of refrigerant)


where
U = overall heat transfer coefficient [Btu/(hr.sqft.F.row )]
LMTD = Log (to the base e) mean temperature difference.

 
But immediately I got it that its not applicable since its the refrigerant and water thingy neither a chilled water air.

Continuing


 
 Tell me please general selection of chiller. or any link will of help.


Thanks


RE: Chiller selection

HAP gives 3 TR, gargage in/garbage out my friend. You can't see a chiller application from a DX application (do you know what DX means?)

Hire an HVAC Engineer and he will do it for you. You seem to be doing a job for which you are not qualified. While this forum will help you sort out questions, it cannot do your work or teach you HVAC from scratch.

RE: Chiller selection

You can buy packaged equipment chillers in small sizes.

Are you sure it's a chiller you want?  If you need cooling water for your machine, you might look at recirculating through a closed loop or mini cooling tower if the supply temps are reasonable.  

3RT can be handled by a small air-conditioning system on the air side.

Get someone to check your calcs, call a vendor and get a recommendation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources