Can penetration grade bitumen 150/200 be used to produce MC-70 on site
Can penetration grade bitumen 150/200 be used to produce MC-70 on site
(OP)
Iwould like to know if penetration grade 150/200 can be used to produce medium cut back (MC-70)on site by blending with kerosine or benzyne:"Field manufacture of asphalt cutbacks"and the procedure requirements,e.g composition of asphalt cutback(percent of cutter required)