INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

STABILITY ANALYSIS OF TRUSS

STABILITY ANALYSIS OF TRUSS

STABILITY ANALYSIS OF TRUSS

(OP)
   I am designing very big double-pitched roof truss (6"per foot pitch, 20 feet deep at midspan, span length is 90'-0"). We can't build this in one piece. So we plan to build two trusses with 10'-0" deep each and splice them in the field. Does anyone have an idea how to check lateral stability of these trusses (lateral bracing requirements, "K" factor used to design compression member, etc.).

Thanks

RE: STABILITY ANALYSIS OF TRUSS

Once properly joined you have a just a truss. There are conventional Ks stated and different values for chords and web members. For chords it is many times used Ky=1 on length between lateral braces, and Kx=1 and lengths between joints with web members. For web members going chord to chord K=0.8, some times even K=0.5 is allowed in the truss plane, and 1 out of it. The idea is the stiffer chords elastically delivering some fixity to the web members. In any case, K=1 is even more traditional for truss design, always for length between braces.

And of course, you may search for the recommended Ks in the texts or codes.


RE: STABILITY ANALYSIS OF TRUSS

Why not just field erect the trusses using bolted connections?  This would save transportion costs (oversize could be eliminated)and would, as ishvaaag said, just create a truss.

The entire truss could then be lifted in place by crane (might require two cranes).  

Be sure to check your truss for the lifting stresses.

RE: STABILITY ANALYSIS OF TRUSS

Good Point Ron.  Lifting stresses or, in general, construction loading/erection schemes are often overlooked and left to the contractor to make all the right choices with little design experience.

Do all parties involved and look at the entire project from design, fabrication, transporation and finally erection.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources