INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Using broken concrete for rip-rap

Using broken concrete for rip-rap

Using broken concrete for rip-rap

(OP)
I have a job where earlier work placed a 6 inch layer of concrete on a breakwater. The state guys that approve of work on these using state funds don't like it.  They want it removed and ordinary riprap placed.

My plan is just to use jack hammers or hydraulic breakers on a back-hoe to reduce the concrete to pieces resembling rip-rap.

We may add some regular rock rip-rap and mix it in for getting a thicker layer.

Comments?

RE: Using broken concrete for rip-rap

I am familiar of breaking it down so the largest dimesion is no greater than 3 times any other for river bank protection.  The biggest problem there has been when someone doesn't want rock they normally skip the filter/bedding requirements and you get scour under the concrete and it looks like the broken concrete was the problem.

On rivers there was some concern if you didn't break it, it floats really well and you may have to go downstream to clean up.

Is it appearance that is the problem?  Could you color the concrete and add some rock of shapes to cover up the concrete to important locations?  Or at least only "correct" the visible areas.

RE: Using broken concrete for rip-rap

(OP)
There is pretty good gradation from sand to cobble sized material in the basic breakwater body.  However, no filter fabric on site and most areas behave fine.

This is on a lake crated by dams on the Mississippi where the only erosion action is occasional big waves in windy conditions, with a reach of a few miles.  Wave height is a few feet max.  At flood times this is overtopped and current is still quite slow.

The only real reason for this work is to fix up some areas that had a blacktop surfacing which broke up due to wave action.  The concreted area held up well, but the funding for the work  had the stipulation to remove the concrete.
We will add a mix of breaker run rock up to 18" armor rock on top of the broken up concrete, mostly hiding it.

RE: Using broken concrete for rip-rap

some hard learned advice ...  if this project is in a river or lake make sure your permits will accomodate the change.
FarmallFan

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources