×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

crane swing

crane swing

crane swing

(OP)
need to determine object swing movement on a crane.

Details are 50 - 100 foot extended load with 50,000 lbs on the hook.

Need to understand relationship of the trolly or bridge speed to the relationship of the movement of the load (swing).

Thanks

RE: crane swing

That will only be analytically solvable for some speed/time profiles of the bridge speed. The load is not important, the length of the suspension is.

I'd just model it in excel, although fancier programs are available, such as Working Model.

Cheers

Greg Locock

Please see FAQ731-376 for tips on how to make the best use of Eng-Tips.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources