INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Splice Welding

Splice Welding

Splice Welding

(OP)
I'm going to use joint B-U4a(SMAW)as per AWS D1.1-2004.

The material specification are as follows;
ASTM A252 Gr.3,  thickness: 12.5mm
Single-bevel-groove weld, ? = 45°, R = +1/16, –0
with backing.

In this case, Whether Welding Qualification Test is required or not?

RE: Splice Welding

The value for root opening you provided, was the "as detailed" tolerance. For the groove angle you have selected, the specified root opening without tolerances applied is 1/4 in (6mm). The "as detailed" tolerance will permit you to specify it up to 1/4 in + 1/16 in = 5/16 in...and no lower. During fit-up, the "as fit-up" tolerances kick in.

The base metal specification does not seem to be covered in D1.1. Check Tables 3.1 and 3.2. If that is the case, then qualification testing in accordance with Section 4 will be required.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources