INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

TOFD instead of RT
3

TOFD instead of RT

TOFD instead of RT

(OP)
dear friends,
our vendor is insisting on this matter that for Cr-Mo steel material he uses TOFD instead of RT..is it possible and acceptable???
thanks a lot,

RE: TOFD instead of RT

TOFD is a form of ultrasonic examination. It is an acceptable form of volumetric examination for most Codes and Standards, provided all parties are in agreement as to acceptance criteria and technique. The TOFD method is more sensitive in comparison to RT for radial/planar flaws in welds and base materials.

RE: TOFD instead of RT

1.  Make sure that the company has a good level 3 NDT qualified to ISO 9712 and not ASNT and that they, and all the level 2 personnel, have documented training and experience on the system concerned.

2.  Acceptance criteria can be very tricky.  There is an ASME VIII Code case (2336 perhaps ??) that can give you guidance.  There may be a very recent EN standard which will probably be superior as it is based on a lot of collaborative research.

3.  If you are deploying inspectors, make sure that they know what they are doing with TOFD.

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

RE: TOFD instead of RT

TOFD and RT being different NDT are used to detect different defects one can not honestly say that he can use one instead of the other they are some times complimentary.

The skill operator’s exigency is grater for the TOFD than for RT operators.

When you request a TOFD service you should be aware of the skills and experience of the operator to have the right output from the test and interpretation of the results.

Luis


   

RE: TOFD instead of RT

2235 is the code case for TOFD for Pressure Vessels only.  Also must be sure thcikness is greater than .500".  Keep in mind that TOFD has "Blind Zones" at both the ID and OD, and as such, must be combined with shear wave probes, two aimed at the root, two at the cap, usually 45 and 60 deg respectivly.  In my opinion, it is far better to combine RT with TOFD.

Regards

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources