Zero Sequence Imp (ZSI) of Transmission Line
Zero Sequence Imp (ZSI) of Transmission Line
(OP)
Test setup for measuring zero sequence impedance of a line is to short all three phases and then measure the loop impedance between shorted conductors and earth return.Question I have is that ,do we we need to multiply measured ohmic value by three to get actual zero sequence impedance?






RE: Zero Sequence Imp (ZSI) of Transmission Line