Verbage in IBC code says we must consider everything when calculating dead loads. How accurate must we get? Is it ok to say:
Beams: 5psf
Purlins: 2psf
Deck: 1psf
Sprinkler: 5psf
Other collateral: 5psf
Total: 18psf
Is this too simplified?
Beams: 5psf
Purlins: 2psf
Deck: 1psf
Sprinkler: 5psf
Other collateral: 5psf
Total: 18psf
Is this too simplified?






RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
All adjusted as reqd... the beam and sprinkler load you use may be on the upper end.
Dik
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
Also I was taught that the sprinklers are fixed to every 2nd purlin therefore you would have twice the load on each purlin as a maximum downward load. This would obviously even out for the beams.
RE: How accurate to be with Dead Loads?
Dik
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
RE: How accurate to be with Dead Loads?
Be accurate and be realistic, since using loads significantly heavier than the customer needs will cost them money they didn't ask to spend.