INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

BPVC U Design & Fabrication Uniformity
2

BPVC U Design & Fabrication Uniformity

BPVC U Design & Fabrication Uniformity

(OP)
Is it a Code requirement that an ASME Sec. VIII Div. 1 pressure vessel design, including fabrication drawings, be performed by an organization holding a valid U-Stamp?  The fabrication of said vessel would be performed by a U-Stamped company.

Our vessel assembly shop has outpaced our design group and we are considering outsourcing some design work.  The question is whether or not it (the design outsourcing) needs to be to someone with a U-Stamp.

RE: BPVC U Design & Fabrication Uniformity

No.  It's not uncommon for design to be sub'd out to third party consultants.  Generally speaking, engineering offices or design consulting firms don't hold U stamps, the U stamp is reserved for fabricators.

If your schedule permits, it might be a good idea to have your in-house team do the calculations, and have a consulting company look after the fabrication drawings, that way the drawings will reflect your fabrication preferences (ie, forgings vs repads, preferred nozzle neck schedules, maximum weld build up, etc).

Keep in mind, final responsibility of the entire unit will lie with whoever puts the U stamp on it, so make good and sure you are happy with whatever drawings you get from your consultant.

RE: BPVC U Design & Fabrication Uniformity

Speak to your AIA.

See ASME SecVIII Div 1, U-2(b) and UG-90(b)(2)

Interpretation VIII-1-89-286

Your QC System will need to address control and acceptence.

You will need to verify and sign for all. Same as redoing the calcs??

I agree with chaulklate overall.

RE: BPVC U Design & Fabrication Uniformity

(OP)
Thank you both for confirming what I thought was the case. I just hadn't dug deep enough into Sec. VIII to find the references to back it up.

We're just going to add to our engineering backlog for an in-house design.

RE: BPVC U Design & Fabrication Uniformity

No but overall responsinsibility is belong to certificate holder

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources