INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

P91 or P92 Supplier

P91 or P92 Supplier

P91 or P92 Supplier

(OP)
Hi everyone,

I am looking for a supplier that could supply blocks of P91 or P92. It is needed for the manufacturing of large specialized (high pressure/temperature) control valve casings.

The location of the supplier isn't crucial...

Regards,
Philip Oosthuizen

Philip Oosthuizen
Company info:
SteinMuller Engineering Services
http://www.steinmuller.co.za/

RE: P91 or P92 Supplier

As I recall from past EPRI studies, the european vendor Georg Fisher was involved in the optimization of forged F91 valve casings 15 yrs ago. Since that time , many other valve mfrs offer either F91 forged valves as well as cast equivalent C12A valves.

Some steam turbine vendors also provide F91 main steam stop valves ( Siemens) , to avoid the thick walled disimilar metal weld ( ie, P91 pipe to 1.5 Cr .5 Mo V cast) that other stg vendors had used but which  are at risk of prompt fatigue failures .

All it would take is to call a dozen major valve vendors, and at least half would offer the F91 or C12 A option.

To weld to these valves, you would need to ensure the "designer" that is designing and specifying the weld interface between pipe and  valve has persons employed that have been educated in the metallurgical peculiarities of these materials, and also treats these weld interfaces as critical areas that need to be reviewed in detail from the standpoint of stress analysis  and fatigue damage during fast startups and shutdowns. QC and NDT procedures and documentation shuld be much more stringent than defined by current ASME code requirements.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources