A plumbing leak caused the contractor to cut out a 5'x5' section in the newly poured 4" slab on grade. Non PT. Just WWF. Light loading. They had to dig down and refill the subgrade after the patch.
I just want to see if anyone has any recommendations for a repair product or procedure other than just drilling and epoxying rebar into the remaining concrete and patching the 5'x5' area w/ concrete.
I just want to see if anyone has any recommendations for a repair product or procedure other than just drilling and epoxying rebar into the remaining concrete and patching the 5'x5' area w/ concrete.






RE: Patching a Slab On Grade
RE: Patching a Slab On Grade
Just a matter of making sure that the granular fill is well consolidated and pouring the concrete 'plug'.
Dik
RE: Patching a Slab On Grade
http://www
I agree with dik, make sure the backfill is well-consolidated.