INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Slab on Grade design data

Slab on Grade design data

Slab on Grade design data

(OP)
I know...another slab on grade design post, sorry. :) I have to designn a slab on grade foundation.  The loads are all pretty much dead load, theres some pumps, compressors with moving parts that will go on it, but for all practical purposes, its all dead load. I have read as many posts on SOG as a i can on here, and some reference books as well ( i am a mech. eng so I was a bit lost at first).
my footprint is 24'x36'.  It seems the way to go here is to over design it.  The soil bearing is 2700 psf.  I was thinking of 6" of compacted 2" crusher run, then 6" of reinforced concrete, with the reinforcement being wire mesh 3" up from the finshed grade of teh 2" Crusher run stone.  WHat about joints? Joints on 48" on center? I need to back this all up with numerical data, calculations, ect.  ANy ideas?

RE: Slab on Grade design data

There's lots of info on the site regarding SOG

For a 6" slab, I'd likely sawcut yours into 12' panels, 1 down the middle, and two transverse.

I'm not sure what is common in your area, but I generally use 6" granular min below the slab.  Other than for uniformity of thickness, test data indicates that slab strength is generally independent of the sub-base.

I generally spec 6mil PEVB between the slab and fill to keep moisture from wicking into the conc slab.

If you use WWF, use it in flat sheets and properly chaired... don't believe that the contractor can lift it as the concrete is being poured.  Use reinforcing steel at 14" min centres so that concrete placers can step between the bar.

I generally spec that the rebar has 2" cover and sawcut the slab 1-1/2" X 1/4".  The added width is used for joint filler.  This is needed to support the edge of the concrete from loading.  The timing of sawcutting is critical... should be about 8 hours or less after finishing or earlier if a sofcut saw is used.  Sawcutting should occur as soon possible without the sawblade 'kicking up' (ravelling) aggregate.

Dik

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources