INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

AASHTO LRFD "At-Grade" Box Culvert Loading

AASHTO LRFD "At-Grade" Box Culvert Loading

AASHTO LRFD "At-Grade" Box Culvert Loading

(OP)
I am designing an "at grade" (Cover < 2'-0") RCB using AASHTO LRFD.  

The State DOT I am in specifically requires us to use LRFD for RCB's.  The LRFD Code only requires the full analysis for HL93 and Lane Load if the supporting walls are > 15 feet apart.  I am designing a Triple 10'(W)x6'(H) reinforced concrete box and the code says "Where primary strips are transverse and their span does not exceed 15.0 ft.-the transverse strips shall be designed for the wheels of the 32.0-kip axle."

I am trying to understand how to apply this load, as stated above.

I have a three barrell box and I am wondering if that 32 kip load is acting alone and moved across the three spans for maximum forces or is it multiple 32 kip loads at some (14'?) spacing moved across the three cell spans?

[I would also be interested in any software that anyone has had success with.]

Thank you

RE: AASHTO LRFD "At-Grade" Box Culvert Loading

The HS-20 axle load configuration is 32k-32k-8k at 14 ft min spacing. I would probably use all three axles (assume 14 ft spacing) with a 32 kip load on the slab over two barrels and an 8 kip load somewhere on the third barrel, and run a few cases to maximize the loads. This will take advantage of the continuity to reduce the maximum + moments , and determine the - moment over the barrel walls.

...or use a program like STAAD, RISA or GT STRUDL and run the moving load generator on a stick model to get all the live load posibilities. Apply the results to your design.

RE: AASHTO LRFD "At-Grade" Box Culvert Loading

(OP)
Thanks jimaitken!

I think I will do that and do the same for the OK overload truck too.

Happy New Year!

RE: AASHTO LRFD "At-Grade" Box Culvert Loading

BRASS CULVERT LRFD is a good program to design Box culverts to the AASHTO LRFD code (3rd edition with 2006 interims).  See http://www.dot.state.wy.us/generic/brass/

STAAD.Pro is the other way to go but takes much longer.

We us Brass to design the box (with hand checks to verify) and design the headwalls independantly.

Something to consider.

 

RE: AASHTO LRFD "At-Grade" Box Culvert Loading

(OP)
Thank you Andy10, I will look into that.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources