INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Corbel or Ledge?

Corbel or Ledge?

Corbel or Ledge?

(OP)
I'm designing a sluice gate structure with a ledge(?) at the top of a deep reinforced concrete box. The ledge is about 20 feet long and will have two point loads occurring about 10 feet apart at the gate lift locations. My question concerns design method - should this be seen as a cantilever ledge or as two corbels? If designed as corbels, should I use the same closed stirrups as if they were isolated and not intrinsic to the continuous ledge?

Any direction or suggestions appreciated.

-Jack

RE: Corbel or Ledge?

I would treat them as two corbels with the point loads.  Can you do the corbel in structural steel as a 'bolt on'?  Might be cheaper.  Don't know the magnitude of the loads or the sizes required.

Dik

RE: Corbel or Ledge?

Design it as a beam ledge - this is analogous to girder ledges used to support precase double-Ts.  There is a design procedure outlined in PCA Notes on ACI 318-0X Building Code.  For the -05 version see p15-3 and Example 15.3.

RE: Corbel or Ledge?

Can we get a tie breaker?

Dik

RE: Corbel or Ledge?

You should be able to design it either way. PCA notes have examples of each methood. I might look at it as 2 corbels ignoring the adjacent concrete and then as a beam ledge, then compare the cost of construction of each way to make the decision. But yes, I would include all the ties if I treated it like corbels.

If the loads are not high and you have the constant ledge anyway, then it might be cheaper to go with the constant depth beam ledge. Do you have a contractor on the project?

RE: Corbel or Ledge?

If they make the ledge the same profile throughout, and they misplace the loads relative to where the corbel ties were installed (or vice versa) there could be a potential problem. The more foolproof way might be to use the beam ledge concept since the corbels may not be isolated as they usually are.

RE: Corbel or Ledge?

(OP)
dik, willisV, and haynewp,

I can't use structural steel for the corbel as I'll need the full length C.I.P. concrete ledge for a working platform for maintenance.
The loads are about 30k each vertical with no applied Nu.
I have a copy of the PCA Notes on ACI 318-02 which has examples of both methods. Should have checked before posting.
I'm going to go with the ledge design.

Thanks to you all for your help.

-Jack

RE: Corbel or Ledge?

Woohoo!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources